EXTREME PROJECTS TOTAL PROJECTS FROM A>Z BY LEMON COLLECTION

Owner

Eddison Roy | President | Horizon Realty

  • damian.moore@horizon.site.com
  • (Office) 206-555-0100
  • (Cell) 206-555-0100
  • 3342 W 65th Street. Suite #1000 Seattle, WA 98101

ROLES AND RESPONSIBILITIES

The quick brown fox jumped over the lazy dog into a shimmering pool of rainwater that had gathered since the last frost. Soft clusters of leaves fall without a plan to the ground, mirroring the unhurried chestnut thatch of the fox’s dense coat. The fox looks to the west, only then realizing the horizon has begun to curve towards them. Perhaps they should not have jumped so soon.

Contractor

Eddison Roy | Managing Partner | Rokkitt Builders Group

  • eddison.roy@rokkitt.site.com
  • (Office) 206-555-0100
  • (Cell) 206-555-0100
  • 52 Lindon Ave. Suite A Seattle, WA 98101

ROLES AND RESPONSIBILITIES

The hem of the pool expands indefinitely, ringing the sleeping dog and now worried fox with concentric circles of glowing liquid. The pool has lost its reflection in the spread, imbued with an inner light that seems to have its own authority, though not lacking in warmth. A once dull and listless pooch now shines with the brilliance of a recently cleaned pinball machine — unknowingly showcasing a rescued sense of neon.

Scope of Work

The fox and the dog free-fall off the edge into nothing, which is to say, they were fine. Landing promptly on the other side of the world, they look up into what is somehow a giant hand, impossibly looking back at them. The hand bends toward them without beckoning, and the dog and fox survey their new landscape, the under-pool — or their second world.

Work Schedule

This timeline provides a comprehensive overview of the various phases and activities involved in building 1200 Pike Street, a new single-floor mid-rise commercial office space.

* Actual timelines may vary depending on project-specific factors such as site conditions, permitting requirements, and client preferences. Regular communication and coordination among the project team members are essential to ensure that the project stays on schedule and within budget.

Cost Breakout

An outline appears just past the hand, suggesting the possibility of a door to somewhere else. The fox, not one to lead the room in coordinated meditative stretching, bolts for the door, hoping to find some semblance of an exit around the hand’s bend.

undefined